WIDENING OF P.R. 122 AND REPAIRS AT BRIDGE OVER
GUANAJIBO RIVER, SAN GERMAN
Project Description
Removal of an existing bridge and construction of a new four (4) span ASSHTO bridge with four (4) lanes and 104.6 meter length, widening of existing highway P.R. 122, relocation of utilities, landscaping, lighting, gabions protection and channel improvements, retaining walls, drainage improvements, traffic signs, pavement markings and other miscellaneous works.
Project Contact Information
Phone # 787-808-0022
Fax # 787-899-0835